Field help (BOMALT7) 

Multiple bills of materials (BOMs) can be defined for a single product. Each BOM code can be assigned specific management features. For manufactured or subcontracted products this includes restriction of the BOM to a specific site and to specific areas of functionality (for costing or for capacity planning).

The first valid BOM code for this product at this production site is displayed by default.