Validation of the scheduling grid checks the coherence of the routing operations. For example, it checks the last operation does not have a next operation, the schedule does not loop and at least one production operation has been declared.
If the scheduling is correct, the Compliantflag is checked (set to 'Yes').
If the scheduling is not compliant, several instances must be checked: