According to the inquiry level, the "Reserve" amount corresponds to:
- Level 1: if the envelopes are attached to a project (Project code entered in column "Reference"), the Reserve amount corresponds to the total of Reserve amounts of envelopes attached to this project. If the envelopes are not attached to a project (Project code not entered in column "Reference"), the Reserve amount corresponds to the total of Reserve amounts of all envelopes of the selection.
- Level 2: reserve amount of each envelope.
- Level 3: reserve amount of each budget.
- Level 4 and level 5: the budget lines do not include reserve amounts and this column is not loaded.