This field displays the total non-productive time, that is, the sum of preparation time, waiting time and post operation time. Non-productive, or delay time occurs after a process has been completed on a machine and until the machine can next be used. It can be either transit time or breakdown time. Non-productive time is not taken into account as workload on the work station.