If the number of Planned OPE is higher than the number of Residual OPE, the total of the OPE of the production plan is revised after the validation of a confirmation message.
When the number of Planned OPE is modified, the plans amortised according to the OU - Operation units method of the assets linked to the production plan must recalculated.