The list of these products is initialized from the subcontract BOM.
The ability to add or exclude materials depends on the value of parameter DEFEORTYP - Default EO management mode (ACH chapter, EOM group). If the modification of materials is authorized, you can perform the following actions using the Actions icon:
- Remove a material by clicking Exclude. The excluded material remains displayed in the grid, but with the Excluded status. You can Reactivate it from the Actions icon.
- Add a material by clicking Add a non-planned material from the last empty line in the grid.
You cannot add an unexpected material to the subcontract BOM when the version management is active on the released product.
In inter-site management, if the material is:
- Supplied by the subcontractor: it must belong to the category Purchased, so that the order can be generated.
- Made available to the subcontractor: the product must be managed in stock and belong to the category Sold if the supplier is identified as a Customer, so that the materials can be transferred to the subcontractor.