Use this field to assign a 'labor' work center to the selected operations. The work center site must match the site for the routing code, if defined.
Type in, or select from the Work Centers table the code of the labor resource to be used for the operations. This work center replaces the existing or assigns a new labor work center to the operations.
Scheduling is not carried out for labor work centers as they are considered secondary and 'always available' (or available at the same time as the main work center). Their load is managed for information purposes only using the coefficients defined for the main work center.
If the main work center is of type 'subcontracting' there is no associated secondary work center.