Checked in the event where a safety stock recalculation previously carried out must be used as the basis of the reorder calculation.
Formula: Average consumption / day * (reorder lead time + reorder time)
The calculation is only carried out if there is a minimum history available. The number of months in the history used has a ceiling with a maximum number or months defined (the most recent months).