When a lot in stock reaches a new control date, a process is used to automatically change its status:
- A. The status of this product moves to Q or R when the new control date is reached.
- Q. This product can be controlled on expiry, for a potential date extension or rejection.
- R. When this product reaches its new control date it is rejected.