Field help (RCCROU) 

At the end of the MPS calculation, a global charge calculation can be required from the routing specified here. Rough Cut Capacity Planning is the translation of the French abbreviation "PGC" (for "Planification Globale des Capacités"). The routing selected must exist in the alternative authorized for the site, with a checked "RCCP" indicator.