Field help (RPLDAT) 

The replacement date is used to manage the replacement of a resource by another provisional method. The replaced work centre is described in an operation with the same number but a higher index.

The replacement date of an operation must fall between the validity dates in the header. In addition, it must be later than the replacement date of the replaced operation.