The loss percentage corresponds to the production or storage loss.
The production loss corresponds to the totaled loss generated for each routing operation.
This percentage is taken into account in the material requirements planning and in the work order management. it is used to calculate the quantity to be reordered to obtain the quantity to cover the requirement.