This field is always the object of an automatic qualification throughout the entry of the different fields that make up the service request.
When the request is not covered by a service contract, this date corresponds to the current date increased by the number of days contained in the global parameter QREAC - CS reactivity level (days) (HDK chapter, SRE group) set to 7 standard days.
If the request is covered by a service request, this date is loaded as a function of the quality constraints in the contract concerned.
If the problem is non blocking, the date is calculated from the Maximum resolution lead-time fields in the Non blocking problemssection.
If the problem is non blocking, the date is calculated from the Maximum resolution lead-time fields in the Non blocking problemssection.
This date can also be affected by a manual modification to the contract. In fact, the customer can be confronted by a specific situation that imposes more extended resolution lead-times than planned. The reasons for this extended lead-time can be described in the Reason field.