The code of the cost structure is mandatory.
- If the assignment of the sequence number has been defined as automatic, this field cannot be accessed and the code is assigned upon cost structure creation.
- If the assignment of the sequence number has been defined as manual, this code can be entered. If it is not entered, it will be automatically specified upon cost structure creation.
The code assigned to the cost structure depends on the setup of the sequence number assigned to the document of Cost structure type of the Common data module (functions Sequence number Structures and Sequence numberAssignment).