There is one transaction in progress.
There is an open log file.
The [OPSS] mask is loaded. The [CBH] and [CBD] classes are loaded. The GREPLANNING variable contains "RPL_PROCESS".
Set the GPE variable to a value different from 0 if the resource does not need replanning.
For the CTLSPE entry point to be triggered, the XRPLCTLSPE variable must have been set to 2 by the REPLANNING entry point.
The CTLSPE entry point is subject to conditions to ensure the global replanning performance is not affected.
All the requirement calculation tables are open.
Use this entry point after the scheduling in order to trigger an update of the WOS WIP or an impact on the child WIPs (MWS requirements).
There is one transaction in progress.
There is an open log file.
The ORD class is loaded in full for the write.
All the requirement calculation tables are open.
An update of the [F:ORD] WIP can be triggered on which the STRDAT and ENDDAT dates are updated by the [M:OPSS] data upon exiting the scheduling, if the GPE variable is forced to a value greater than zero.
Use this entry point after the scheduling in order to prevent an update of the WOS result, or an impact on the induced MWS requirements.
There is one transaction in progress.
There is an open log file.
The CBDclass is loaded in full for the write.
All the requirement calculation tables are open.
An update of the CBN [F:CBD] result can be prevented after the scheduling, if the GPE variable is forced to a value different from zero.
Use this entry point after the resource replanning to modify the MRP result.
There is one transaction in progress.
There is an open log file.
The CBDclass is loaded in full for the write.
All the requirement calculation tables are open.
To prevent the CBN [F:CBD] class from being rewritten, set the GPE variable to a value greater than zero. If the standard rewrite is required, do not modify the GPE variable or keep it as zero.