Table | Significant content | Table description |
WORKLOAD | Yes | Work centre load |
PARJAL | Yes | Scheduling setups |
This entry point is used to intervene on the reference date used by the scheduling in the recalculation of the loads (after the regeneration of the WORKLOAD table).
This entry point is set within the framewordk of the loads recalculation on a site without scheduling, in-between the cancellation and regeneration phases. Thus, it is used on WO that have an inffluence on the positionning of the load.
Table MFGHEAD [MFG1] is located on the WO that is being re-calcultated at the call to the entry point.