This entry point is used to insert additional logic in the allocation of each component linked to the sub-contracting. It is called in all allocation cases (EO management, planning workbench, automatic processes...) and is used notably to activate/de-activate the allocation of a component responding to certain criteria.
There is one transaction in progress.
There is no open log file.
The SCOMAT ([F:SCM], ITMMASTER ([F:ITM]) and ITMFACILIT ([F:ITF]) tables are loaded at the moment that the entry point is called.
This entry point has been designed to make it possible to de-activate the allocation of components responding to certain criteria. This de-activation is possible by setting the WRET variable to 9. If the component must be allocated, the WRET variable should be left at its current value.
In the grid below, the significant content flag indicates that the content is coherent with the context (...).
Table | Significant content | Table Title |
SCOMAT | Yes | Materials |
ITMMASTER | Yes | Products |
ITMFACILIT | Yes | Products/Site |