This entry point is used to insert logic in the re-write of the link to the replaced BOM in order to modify certain fields or to manage specific/custom fields.
There is one transaction in progress.
To cancel the transaction if there is a problem, the GOK variable must be set to 0.
There is an open log file.
The buffer [F:BOD] is loaded at the moment of the entry point call.
In the grid below, the significant content flag indicates that the content is coherent with the context (...).
Table | Significant content | Table Title |
BOM | Yes | BOM header |
BOMD | Yes | BOM detail |
FACILIT | Yes | Site |