When validating a WO update.
The [M:MFG*] screens are on line.
This entry point was designed in order to prevent the descheduling/rescheduling of WOs with an Optimized scheduling status. To do so, the GPE variable must be activated.
The EP code is the following:
#---------------------------------------------------------------
# Processing: ZMFGLIBA
# Entry point: OPTSCDRAZ Issue 104504
# Not descheduling optimized WOs (External detailed scheduling)
#---------------------------------------------------------------
$ACTION
Case ACTION
When "OPTSCDRAZ": Gosub OPTSCDRAZ
Endcase
Return
#---------
$OPTSCDRAZ
GPE=1
Return
In the table below, the significant content flag indicates that the content is in phase with the context.
Table | Significant content | Table Title |
MFGHEAD | Yes | OF |
MFGOPE | No | WO operations |
SCHEDULING | No | WO scheduling data |
ITMFACILIT | Yes | Product-site |
FACILITY | Yes | Sites |