Time management > Time - Labor > Inquiries > Individual planning > Individual planning - Implementation  

Prerequisites

The natures of activity must be attached to a group of natures (local menu 417).
The employee's operating planning must be entered.

Activity codes

The following activity codes (sorted by type) may have an impact on the way the function operates :

Dependent activity codes

These codes are never entered in folder management, because their value is calculated :

 HOR1 (Time slot 1), HOR2 (Time slot 2), HOR3 (Time slot 3),

Sizing

 HOR : Number of time slots

Authorizations

The following options can be activated or de-activated for each user :

 All users

Other prerequisites

Local menus

The following parameterizable local menus are used by the function. Their content must be updated if necessary :

 Local menu number 417 : Planning

Tables used

The following tables are managed by the function :

Table

Table description

PLANEMP [PLE]

Employee plannings