The management of this code depends on the value of the CTLOPPCOD - Mandatory project control parameter (TC chapter - MIS group).
- When the value is No, it may be a code selected freely.
- When its value is Yes, an existence check is systematically applies to the entered project code.
You can use the Selection icon to display the list of available project codes.
The management rules of this field are based on the PJTSNGDOC - One project by document- parameter (TC chapter, MIS group).
- When this parameter is set to Yes, the management of multiple projects is prohibited.
The project code is always the same on the document header and on the lines.
The project code entered on the header is used to filter the receipts suggested in the picking list. If no project code is entered, it is automatically loaded with the project code of the first selected receipt.
If you modify the document header project code, this code is automatically used on all the lines.
- When this parameter is set to No, the management of multiple projects is authorized.
In direct creation, the project code you enter on the document header is used to initialize the project code of the document lines and can be modified.
If you modify the header project code, a dialog box opens and suggests to transfer this code to the lines of the document, according to the following options:
- Yes: the project code is transferred to all lines.
- Yes if same value: the project code is only transferred to the lines associated to the former project code.
- No: the project code is not transferred to the lines.
When an analytical dimension type is used in the Project management tracking, any modification of the project code on the document header leads to the reinitialization of the dimension code of this dimension type, based on the Default dimensions setup. If the project code is used onto the lines, the dimension code of impacted lines is also reset.