Field help (BOMWKL) 

If it is checked, this means that the assembling TOs are going to be split in order to comply with the load limitations set for the preparation area.
The load calculation will always be performed on the removal preparation area. In the case of removal preparation multi-area TOs, it is mandatory to specify the preparation area to be considered for the calculation in the "Prepa Area" field.