Entry points > Module Geode GX > Standard script SUBBMH 

CHGBMHSTA: after setting the header and the AO lines to 9

This entry point is used to introduce specific developments after the header and the lines of an assembling order have been set to 9 (Complete) upon completing it.

Context and operating method

This entry point is called after the header and the lines of an assembling order have been set to 9, and before the assembling report has been created.

The GOK variable is tested on return from the entry point. If GOK<1, the current transaction will be rollbacked.

Transaction

There is a transaction in process when this entry point is called.

Available variables and tables

BOMORDERH table open and fed

OBMHSTA contains the status of the AO header before the status update.