Refer to documentation Implementation
Presentation
It is mandatory to enter a site. The site shown by default corresponds to the site associated with the user.
Scheduling status
The requested load status should be mentioned: Scheduled or Not scheduled
Load type
It is possible to select the load type required.
Selection criteria
It is possible to extract the load by criterion
It is advisable to regularly carry out a load calculation (see the Load recalculation documentation) in order to re-synchronize the loads with respect to the periods defined in the scheduling setups.
Close
Fields
The following fields are present on this tab :
Selection criteria
| The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on its authorizations. |
Load to process
|   |
| Filter on statuses. |
| Filter on statuses. |
| Filter on statuses. |
| This flag is used to filter the suggestions based on their origin. |
Selections
| The work center group is a physical or fictitious entity grouping several work centers of machine, labor or sub-contracting type. |
| The work center is attached to a work center group. It corresponds to a production resource on which a routing operation is carried out. This is an entity for which it is requested to plan loads and track production times. Each work center is associated with an attachment site. |
| This field identifies the type of operation that is performed at this work center. This might be a machine, a labor resource, or a subcontracted operation. Work centers of type Subcontracting are managed externally by subcontract suppliers. |
|   |
| Periodicity of the inquiry:
|
| Start date for the inquiry. |
| Number of periods to view. |
Close
It is possible to memorize one or more sets of criteria from the memo codes. |
This button is used to remind the setup of the previously created memo codes. |
This button is used to delete memo codes. |