Refer to documentation Implementation
The Remove from scheduling function contains a single screen into which you enter your work order selection criteria.
Presentation
Use this section to define the production site at which work orders are to be removed from the scheduling process.
Use this section to define the selection ranges to be used for filtering the results of the search.
Use this section to filter the results by the status of the work order.
Close
Fields
The following fields are present on this tab :
Selection criteria
| Type in or select the production site from which the work orders are to be selected. This field is mandatory. |
Start - end range
| Filter for results within a range of work orders. For a single work order, enter the same work order number in the from/start Work order and to/end Work order fields. |
| Filter for results within a range of project/project task codes. For a single project/project task, enter the same project/project task code in the from/start Project and to/end Project fields. If the content of this field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the project operational (task) structure. For example, if a material task code is "USA-P3" and a project code is "USA12345678", this field displays a link to the project operational structure as "USA12345678!USA-P3".
|
| Filter for results within a range of "ship-to" customers and/or sites. For a single customer or site, enter the same code in the from/start Destination and to/end Destination fields. |
| Filter for results within a range of source sales orders. For a single sales order, enter the same code in the from/start Order no. (Order number) and to/end Order no. fields. |
| Filter for results within a range of finished products (BOMs). For a single bill of materials (BOM), enter the same product code in the from/start Released product and to/end Released product fields. |
| Filter for results within a range of dates. For a single day, enter the same date in the Start date and End date fields. You can leave the Start date field blank to search all records to date. |
Filters
| Select this check box if work order suggestions are to be processed. If work order suggestions are to be excluded from the run, leave this check box clear. |
| Select this check box if planned work orders are to be processed. If planned work orders are to be excluded from the run, leave this check box clear. |
| Select this check box if firm work orders are to be processed. If firm work orders are to be excluded from the run, leave this check box clear. |
| Select this check box if work orders optimized for scheduling are to be processed. If optimized work orders are to be excluded from the run, leave this check box clear. |
| Select this check box if work orders currently being optimized are to be processed. These are work orders that have been submitted for scheduling but have not yet been scheduled. If work orders being optimized are to be excluded from the run, leave this check box clear. |
Close