Manufacturing > Batch processes > Operation date shift > Operation Date shift - Implementation 

Pre-requisites

General parameters

The following general parameters may change the way the function is working :

Manufacturing

 RELSTRDAT (defined at level Site) : Level on WO start date change

Authorizations

An authorization can be granted for this function to limit the processes to a company or a site.

Miscellaneous pre-requisites

The scheduling setups must be defined for the production site selected.

Tables used

The following tables are implemented by the function :

Table

Table description

MFGHEAD [MFG]

Work order - header

MFGITM [MFI]

Work orders - products

MFGMAT [MFM]

Work order - materials

MFGOPE [MFO]

Work order - operations

OPERATIONS [OPS]

Load in progress

ORDERS [ORD]

WIP

SCHEDULING [SCH]

Work order scheduling

WORKLOAD [WKL]

Production load