The selected site must be defined as a production site.
You must define the parameters that control the production scheduling process for the selected site.
The following general parameters may change the way the function is working :
RELSTRDAT (defined at level Site) : Level on WO start date change
An authorization can be granted for this function to limit the processes to a company or a site.
The following tables are implemented by the function :
Table | Table description |
---|---|
MFGHEAD [MFG] |