During the period closure and when there is no modification of the setup or job action done on the asset during the period, the status of the asset is not modified; it keeps its value: Calculated.
If the asset is concerned by the installation of a job action (depreciation, new evaluation, etc.) or the modification of an setup item (the item list is given below), the re-calculation of the asset is necessary.
As a consequence:
For more information concerning the execution of the calculation optimization, please refer to the attached document: Calculation optimization.
Refer to documentation Implementation
Presentation
This function is made up of a single screen that is used to:
Upon process completion, a log file displays the list of modifications on hold that have been processed for each contexts concerned, and the number of modifications done for each of them.
Close
Fields
The following fields are present on this tab :
Selection
| Select the All companies check box to include all companies or leave this check box unselected and enter a specific company in the Company field. |
| This field displays the company code. |
| When it is activated, this tick box enables the user to specify that the process must be applied to all the contexts (either for all the companies or for the selected company). |
| Enter the depreciation context. |
Close
It can be the modification:
- Of one or several of the following parameters from the AAS chapter (Fixed assets):
- Of one or several of the values from the following miscellaneous tables:
- Of contexts. It can either be: