This parameter is used when scheduling work orders. Use it to define if load times (waiting time and/or post run time) should be included in the scheduling calculations.
Yes - This is the default value for this parameter. When both waiting time and post-operation time are recorded, both times are included in the scheduling calculations independently, and displayed separately in the results of the scheduling, in the scheduling graph and list.
No - The longest of either the waiting time, or the post-operation time, is used in the scheduling calculations.
This parameter is defined at the level Site.It belongs to Chapter GPA (Manufacturing) and the Group LOA (Scheduling/Load),The following parameters are also associated with this chapter and group :
The global variable GSCHEDWPO is associated with it.
The following functions are associated with this parameter :
Manufacturing > Batch processes > Scheduling/descheduling > Descheduling
Manufacturing > Batch processes > Scheduling/descheduling > Scheduling
Manufacturing > Planning > MPS processing
Stock > Reorders > MRP processing
Manufacturing > Planning > MRP processing
Manufacturing > Planning > Work order