Reports > Module Stock > Report CBNHEA (Net requirements report) 

 This report presents the results of the last MRP processing started for a site.

The results are presented by product for all the products processed by this calculation.

The MRP calculation is accessible in the Stock and Manufacturing modules.

Prerequisite

List of criteria

Parameter

Parameter title

Type

Site

Site

FCY

impselections

Print selections (Local menu No, Yes)

M1

Description of the report

This report mentions by site and by product the WIP for this product, including the MRP proposals.

Products are sorted by ascending order from the lowest BOM level, then by ascending order of the products:

  • Product header

The product header paragraph reminds the product characteristics:

Description

BOM level (BOM lowest level indication)

Reorder policy associated with the product

Start stock level

The firm and requested horizon dates, based on the parameterization of these data in the product-site record.

  • Result table by product

This table presents the WIP with among others:

Order type and part number

Start date and end date, requirement date, request date, period indication (based on the division of the periods specified in the MRP start parameters).

The requested quantity, the calculated quantity.

The order of origin and the associated original part number

The original product (BOM descent)

Alert message of the replanning caclculation based on the MRP parameterization