Reports > Module Manufacturing > Report MFGHEADL (WO detail list) 

Use this report to print a history of in progress and completed production at a specific company. The details summarize the information about each component and each operation on a work order. This provides you with a comprehensive analysis of production history at the selected site.

All or a range of work orders can be included selected by planning or production site code, routing code, dates and status.

Prerequisites

Access to the report

This report can be accessed from the report menu of the group Manufacturing - Analysis.

List of criteria

Parameter

Parameter title

Type

Société

Company

CPY

siteplanifdeb

Planning site range

FCY

siteproddeb

Production site range

FCY

numOFdeb

Journal no. range

MFG

gammedeb

Routing range

ITM

debutOFdeb

Work order start:

D

finOFdeb

Work order end:

D

modelancdeb

Release mode (Local menu Complete, Materials only, Operations only)

M333

typelancdeb

Type of release (Local menu To be completed, Complete)

M371

statuallocdeb

Allocation status (Local menu Not allocated, Partial, Complete, Partial/Shortage...)

M336

etatjaldeb

Scheduling status (Local menu Not scheduled, Scheduled, Reschedule...)

M335

etatsuivdeb

Tracking report (Local menu Pending, Being optimized, Printed, In progress...)

M339

rupturesite

Break on site (Local menu No, Yes, Yes with page break)

M2406

ordretri

Sort order (Local menu WO n°, WO start date, WO end date)

M2390

impselections

Print selections (Local menu No, Yes)

M1

Comments

The data is filtered by site according to the rights granted to the user on the function GESMFG (Work order management).

Description of the report

This report prints details of the individual operations and individual components for individual work orders. The total number of finished goods required is provided as well as the expected and actual operating times for each operation.

Each individual job ticket has three distinct sections. The following fields are included:

  • Header:
    • The production site.
    • The work order number - in ascending order.
    • The dates the work order was scheduled to start and be completed by. These dates are either the start or end date defined for the work order, or the date calculated for the defined scheduling method.
    • The assembly (bill of materials) or code of the finished goods.
    • The major, or major and minor version of the finished good that applies. Major versions might be used where there have been increased or significant changes in functionality. Minor versions might be used where there have been minor features or changes in functionality, or significant fixes applied to a specific major version.
    • The quantity of finished goods required and the quantity completed.
    • The unit of measure applicable to the quantities.
    • The current status of the work order.
  • Operation details:
    • The sequence, or the order in which this operation comes in the routing and the description of the operation.
    • The expected, or planned and actual, setup and run times. The actual times show the time taken to perform the operation until the total release quantity is completed.
    • The unit of measure applicable to the run time.
  • Component details:
    • The product code of the components and any subassemblies.
    • The major, or major and minor version of the components or subassemblies that applies.
    • The quantity of the component required and the actual quantity used (consumed).
    • The unit of measure applicable to the quantities.
    • The current status of the work order.