Functional prerequisites and postrequisites for the upgrade of a folder

Prerequisites to the upgrade process

  1. Make sure the data to upgrade is consistent.
    It is not always the case for folders containing many movements and that have gone through maintenance phases (especially if there are specific developments).
  2. Go to Development > Utilities > Verifications > Data > Consistencies to detect any problem that could generate errors during the upgrade process and require to restart it.
  3. Purge temporary tables that might take a long time to upgrade (for example the query table).

Financials

GEXEAN variable

Global variable GEXEAN has been deleted from the variables dictionary (GESAGB). Any development requiring the GEXEAN global variable needs to call the EXEAN subprogram to allow the declaration and initialization of this variable:

If dim(GEXEAN)<0: Call EXEAN From GLOBCPT: Endif

Postrequisites to the upgrade process

Financials

Management of XML bank files with the pain001.001.003 format

To enable this feature, copy the following settings from the X3 folder to the operating folder:

Optional management of the BIC code

To enable this feature, copy the following settings from the X3 folder to the operating folder:

Factoring management with or without recourse

To enable this feature, copy the following settings from the X3 folder to the operating folder:

New accounting code lines have been delivered in the GESCCL function - Line 4 to 11 for "factor" accounting codes. You need to adjust the accounting codes of the "factor" type in order to add the new accounts to be used, depending on the customer's chart of accounts.

Fixed Assets

Buildings

Make sure buildings have been converted during the upgrade and that they are available in the PHYBUI representation (Common data > Fixed asset tables > Buildings).

Locations

Make sure locations have been converted during the upgrade and that they are available in the PHYLCT representation (Common data > Fixed asset tables > Locations).

Physical assets

Make sure physical assets have been converted during the upgrade and that they are available in the PHYELT representation (Common data > Fixed asset tables > Physical assets).

Production workbench

Make sure the unit defined at the level of parameter DEFUOM - Default unit (FAS chapter, FAS group, folder level) is displayed in the production plan header (Fixed assets > Fixed assets > Production plan).

Import templates

Since the implementation of a new management for physical elements and for the stock count in update 9, the related import templates have been deleted in the upgrade.

Mass recodings

After the upgrade, (optional) mass recoding setups can be deleted because of obsolete keys. Make sure their recoding parameters, if any, are available (Fixed assets > Utilities > Mass recoding).

Distribution

Quote types

The upgrade process must assign a quote type in the Quote type field (SQHTYP) for all existing quotes.

During folder creation, the following quote types and general parameters are copied from the reference folder:

Only the types whose legislation is empty or managed in the destination folder will be copied from the reference folder.

You can set up this data on two levels, depending on the upgrade time:

Identification of the quote type in the upgraded folder:

  1. For each quote, the system checks the value of the SQHTYP general parameter.
  2. If no value is defined for this parameter, the system selects the first quote type (in alphabetical order) that matches the company legislation related to the quote.
  3. If no result can be found, the system selects the first quote type (in alphabetical order) with an empty legislation.

If the quote type has not been determined after the search in the upgraded folder, the search is then performed in the reference folder:

  1. The system selects the first quote type (in alphabetical order) that corresponds to the company legislation of the quote.
  2. If no result can be found, the system selects the first quote type (in alphabetical order) with an empty legislation.

After the upgrade, or when the upgrade is performed after folder validation, the sequence numbers defined in the GESTCA function (Setup > General parameters > Sequence number definition > Assignment) must be reassigned to the appropriate quote types in order to preserve the sequence numbers order.

Price initialization on an inter-company sales order

During the upgrade process, a value is assigned to the Price transfer field, in the Automatic flows table of the Inter-company setup function (Setup > Organizational structure > Intercompany) for each flow line.

Transfer rules for invoicing elements of the Sales module

In the Invoicing elements function (GESSFI), you need to check the values of the new lines of the Transfer rules table.

During folder upgrade, the rules that apply to these new lines in the Invoicing elements function are based on the following principles:

You can only modify this rule when the validation is complete.

EU Intrastat

For folders where subcontracting is managed, you must perform a blank extraction after an upgrade to update 9 in order to identify the documents that have not been extracted yet. Otherwise, these documents will be displayed when performing a new extraction with the Intrastat declaration.