A date constraint code can be associated with a batch task or a group of tasks, in order to define the days that are authorised for its launch.
It is defined in two grids containing the authorised time ranges :
Close
Fields
The following fields are present on this tab :
Block number 1
| This code is used to identify a time constraint that can be assigned to a task or group of tasks. |
| Title associated to the previous code. |
Work days
| These check boxes define the days in the week that are worked. |
Other days calendar
| This code is used to define the holiday days that are added to the non checked boxes in the record to define all the non working days. |
Grid Hours/day worked
| These fields are used to define the time slots authorized for working days. |
|   |
Grid Hours (worked) other days
| These fields are used to define the time slots authorized for non working days. |
|   |
Close
In addition to the generic error messages, the following messages can appear during the entry :
An interval has been entered with an end date less than the start date.