Presentation
One or several DOs can be selected manually or using the action menu by means of the "Tick all" or "Untick all" options.
Validate the selection by clicking .
The "Simulation" check box is used to switch from a complementary PO launch mode (by default) to the simulation mode where all data is deleted further to the processing.
When launching complementary POs, the following processings are performed:
- Generation of output movements and parcels for POs prepacking.
- Generation of picking orders assigned to the DO wave number
- Generation of temporary DNs according to the output configuration used on the current depositor.
The 'Merging of flows' preparation type is completely prohibited when using this functionality irrespective of the set up.
- POs are usually printed by the laser printer set up on the preparation field, and based on the DO preparation mode,
- Replen. orders and Replen. labels are printed based on the output configuration setup,
- temporary delivery notes are printed by the laser printer set up on the preparation field and based on the current depositor output configuration,
- the preparation loading document is printed based on the current depositor output configuration and on the wave shortage list
In case of addressing problem, Warehousing displays an log of errors that describes the reason for the faulty addressing for each DO.
After correction, the addressing can be launched again.
The DO status changes: if it is greater than 4, the creation of new addressed output movements sets it to 4-In preparation process
Close
Fields
The following fields are present on this tab :
Grid Delivery order
| No help linked to this field. |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
Block number 2
| Used to move from the actual mode (by default) to the simulation mode, where all the data are deleted further to the processing. |
| Used to display the log (progress) of the program at the end of the processing. |
Close
Action icon
The button is used to view the progress of the processing |
If directive missions are managed, the creation of associated missions complies with the setup of the missions (and not those defined for the wave) when a complementary PO is released.