for all calculations, are considered the tasks of the current site whose end dates belong to the entered date range.
this function belongs to the optional module GEOMIPS
Refer to documentation Implementation
The function is comprised of a selection block and a grid that displays the statistics by type of resource and resource.
Fields
The following fields are present on this tab :
Block number 1
|   |
|   |
| Code identifying the type of resource (defined by site). A resource type identifies a set of resources likely on any given site to perform the same types of missions, access the same mission areas and use the same types of materials. |
| Specifies the resource code. |
|   |
|   |
| Specifies:
|
| Specifies the number of specific missions having at least a task with status '8-Processed' assigned to the resource. |
| Specifies the number of tasks with the status '8-Processed' assigned to the resource. |
| Specifies the number of tasks with the status '9-Rejected' assigned to the resource. |
| Specifies the number of operations with the status '8-Processed' for tasks assigned to the resource. |
| Specifies the number of operations with the status '9-Rejected' for tasks assigned to the resource. |
| Specifies the average number of operations per task. It is the number of operations (irrespective of their status) of tasks with the status '8-Processed' or '9-Rejected' assigned to the resource divided by the total number of tasks with status '8-Processed' or '9-Rejected' assigned to the resource. |
| Specifies the average number of mission areas per task. It features the number of mission areas that are distinct from tasks with status '8-Processed' or '9-Rejected' assigned to the resource (considering the start area of the task, its end area, the area of each operation of the task) divided by the total number of tasks with status '8-Processed' or '9-Rejected' assigned to the resource |
Close
Action icon
This button provides tunnel access to the resource type.
This button provides tunnel access to the resource.