Refer to documentation Implementation
This inquiry contains:
Presentation
Use the header information to define the site and the product for which you want to display the available stock.
You can also define:
Close
Fields
The following fields are present on this tab :
Block number 1
| Enter or select the storage site where the selected product is active. The Selection icon (magnifying glass) only suggests products that are referenced in the products-sites table. |
| Enter the reference of the product for which the stock needs to be inquired. |
|   |
| Enter the reference date used for calculating the expiration date of a lot in stock. This field displays today’s day by default. The availability of this field depends on the expiration management mode set on the product record. |
Block number 2
| Periodicity of the inquiry:
|
Close
Presentation
Two sets of information are displayed in this section:
Close
Fields
The following fields are present on this tab :
Current stock
|   |
|   |
|   |
|   |
|   |
|   |
Block number 2
|   |
|   |
|   |
|   |
Grid Detail stock situation
|   |
|   |
Grid Available stock
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
Close
Action icon
Click WIP from the Actions icon to display the orders included in the totals for the selected line.
Close
The following fields are included on the window opened through this button : Selection
Order type
Starting stock deductions
Add initial stock
Block number 7
Suggestion filter
Periodicity
Display
Close Click the Criteria action to access additional selection criteria: Order type Suggestion filters You can control the starting stock levels by defining which stock is to be considered in the projected stock calculations. For example, you can exclude detailed allocations from the starting stock. Conversely, you can add stock in quality control and in transit to the starting stock. You can also control the calculations by defining if product-site loss percentages and sales forecasts should be included. Expiration considered
If Expiration considered is set to 'Yes': You can save one or several sets of criteria by saving Memo codes. |
Click the WIP action to display the work in progress for the selected product and site. |
Click the Graph action to display a Graph of available or available to promise requirements and resources by period. |