Presentation
Click the following link for the scheduling documentation: Sage X3 Production Scheduler
The planner can apply modifications to a schedule to manually redistribute the suggested machine, labor or subcontracted workload. To 'fix' or 'pin' a modified operation click one of the following action (Actions > Pin operations), this will ensure the Optimization process uses the manually forced date/time:
To unpin the operation and revert to the original scheduled date/time click the Unpin action (Actions > Pin operations) then clear the Fixed start date (Indicators & Details > Operation > Operation fixed dates) check box.
Close
Fields
The following fields are present on this tab :
Block number 1
| Type in or select the work order production site for which you want to display the scheduling. This field is mandatory. |
Block number 2
|   |