Manufacturing > Production Scheduler > Production Scheduler viewer 

Production Scheduler is a planning tool used to view the scheduling of work orders in the form of a Gantt chart. Elements are sorted by production order, by work center and by workload.

Used in a short-term context, the Production Scheduler function sets up a schedule to implement and distribute workload. It is particularly useful for adjusting unexpected production or supply events.

Used in a medium or long-term context, the Production Scheduler function can simulate workload in order to analyze what a facility is capable of producing within a given objective.

Production Scheduler provides you with two types of plans, a 'work plan' and a 'published plan':

  • The 'work plan' is the proposed schedule. The planner can apply modifications to this schedule to manually redistribute the suggested machine, labor or subcontracted workload.
     The planner cannot apply modifications to scheduled operations where the start date or start time has been preset in the work order (fields Forced start/Forced time). A forced start date/time is fixed in the schedule and 'pinned' automatically. Production scheduler cannot, therefore, optimize its scheduling capabilities as 'pinned' operations are blocked from manual changes. To change a scheduled operation with a forced date/time the work order must be first be removed from the scheduling (using the Work order Remove from scheduling action). The date/time must be adjusted accordingly (or deleted) in the work order then the work order resubmitted for scheduling.
  • The 'published plan' is the planner's confirmed schedule. The planner can publish either the original, proposed work plan or their modified work plan.
    If the published plan is different from the original, proposed schedule the elements modified by the planner are updated in the relevant work order records. These can include the work order (WO) start and end dates, scheduling status, WO situation and, potentially, the work center.

You can use the Production Scheduler viewer function to view the scheduling (for inquiring into elements of the plan and for browsing through time). Note that you can only use this function to view the scheduling, you cannot use it to reorder elements within it.

Production Scheduler is only available for on-premises instances of Sage X3.

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

Entry screen

Presentation

 Click the following link for the scheduling documentation: Sage X3 Production Scheduler

The planner can apply modifications to a schedule to manually redistribute the suggested machine, labor or subcontracted workload. To 'fix' or 'pin' a modified operation click one of the following action (Actions > Pin operations), this will ensure the Optimization process uses the manually forced date/time:

  • Reserve resource to reserve the resources for the duration of the operation, or
  • Allow overload to allow the capacity of the resource to be exceeded for the duration of the operation.

To unpin the operation and revert to the original scheduled date/time click the Unpin action (Actions > Pin operations) then clear the Fixed start date (Indicators & Details > Operation > Operation fixed dates) check box.

Close

 

Fields

The following fields are present on this tab :

Block number 1

Type in or select the work order production site for which you want to display the scheduling. This field is mandatory.

Block number 2

  • field PSCIFA

 

Close

 

Error messages

The only error messages are the generic ones.

Tables used

SEEREFERTTO Refer to documentation Implementation