The Project copy function is structured as follows:
Presentation
Use this section to define the source project and the destination project code details. You can copy project details from one project code to an existing project code, or to a new project code.
Close
Fields
The following fields are present on this tab :
Source
| Use this field to define the parent (or source) project code, or template project code to be duplicated.
|
| This field displays the sales site from which this source project is managed. |
| This field defaults to the currency associated with the displayed sales site (field Sales site). |
Destination
| Select this check box to copy the structure of the source project, or template project into a current project. |
| Use this field to define the project into which the structure of the source project, or template project (field Project) must be copied.
|
| Use this field to define the destination project code. Type in a project number (or code) or leave blank to generate the next number on file.
|
| This field displays the description from the source project code. Type in a different description for the new project, if required. |
Close
Presentation
Use this section to control which elements of the outline project structure to copy from the source project to the destination project.
Key elements of the source project are used as the basis for the destination project. These include the sales and operational sites, and the currency. You can change the sales and operating sites after you create the new project, however you cannot change the currency. You must ensure, therefore, that the default values are correct for the new project before you confirm the project copy.
Each check box in this section is associated with a level in the structure of the source project. The suggested value (selected or clear) for each check box is predetermined for you. You can clear or select each check box, as required.
The help for selected fields in this section prompts you to think about the effect of selecting the option (check box) on the destination project. For example, whether task operation due dates should be copied from the source to the destination project or whether the value in the destination project should be blank.
The tables in the Tasks and Budgets sections are populated from the task and budget levels in the source project. Use those sections to individually select (or deselect) lines in the structures to be copied to the destination project.
Tip: Use the 'All' check boxes in the Tasks and Budgets blocks to select or deselect all task and budget lines in the Tasks and Budgets sections.
Close
Fields
The following fields are present on this tab :
Destination
| Do you want the destination project to be managed from the same sales site as the source project? |
| Do you want the operational site for the destination project to be at the same operational site as the source project?
|
|   |
| This field defaults to the currency associated with the sales site (field Sales site) displayed for the destination project. It cannot be changed once the project has been created. Do you want to manage project costs in the destination project in a different currency?
|
| Use this field to define the exchange rate type to be applied to all project charges in the destination project (that is a daily (current/spot) exchange rate, an average exchange rate or a monthly exchange rate). The values are defined in Local menu 202. Do not amend or delete the values in this menu. |
| Use this field to define a reference date for any currency conversions.
|
Dates
| Do you want to copy the duration of the source project, and the duration of each task and operation in the source project to the destination project? The Duration fields are used in conjunction with the site calendar and, for operational tasks, the weekly structure assigned to a resource to automatically calculate start and end dates. Select from the following options:
|
| Do you want the task operation start/end dates to be blank (the value of the fields Start date/End date (TASSTARTDT/TASENDDT) at each level of the operational (task) structure)? |
| Do you want the project and task operation due dates to be blank (the value of the field Due date (DUEDAT) for the project and at each level of the operational (task) structure)? |
| Do you want the required dates for the material requirement tasks to be blank (the value of the field Requirement date (REQDAT) of each material requirement line in the Products section of the operational structure)? |
| Do you want the dates associated with task operations (labor tasks) to be blank (the value of the fields Actual start/end date (OPESTARTDT/OPEENDDT) of each labor task line in the Operations section of the operational structure)? |
| Do you want the dates associated with resources (employees) assigned to labor tasks to be blank (the value of the date fields Start/End (OPESTR/OPEEND) of each labor task line in the Operations section of the operational structure)? |
Tasks
| Select this check box to copy the complete operational (task) structure from the source project to the destination project.
|
| This check box is selected automatically if the All tasks check box (field TACALL) is selected. Leave this check box selected to copy all task operations (labor tasks) from the source project to the destination project. If you do not want to copy labor tasks to the destination project, clear this check box.
|
| This check box is selected automatically if the All tasks check box (field TACALL) is selected. Leave this check box selected to copy all material requirements tasks from the source project to the destination project. If you do not want to copy material requirements tasks to the destination project, clear this check box.
|
| Select this check box to copy all employee lines assigned to task operations (labor tasks) from the source project to the destination project.
|
Budgets
| Select this check box to copy the complete budget (cost) structure from the source project to the destination project.
|
| This check box is selected automatically if the All budgets check box (field BUDALL) is selected. Leave this check box selected to copy all expense forecasts for all chargeable budget codes from the source project to the destination project. If you do not want to copy expense forecasts to the destination project, clear this check box.
|
Descriptions
| Do you want to duplicate the description supporting the source project for the destination project (the value of the free-format Description (OPPDESTEX) field in the General section)? |
| Do you want to duplicate the comments supporting the source project for the destination project (the value of the free-format Comment (OPPCOMTEX) field in the General section)? |
Close
Presentation
This section is populated with the operational (task) structure for the source project. The selection criteria you defined in the Criteria section determines which lines in the table are selected.
Use this table to individually select (or deselect) lines in the task structure to copy to the destination project. You can adapt the source task codes and descriptions for the destination project, and even change the site from the default values.
Budgets linked to tasks that you have selected to be copied to the destination project will be copied automatically. Parent tasks and budgets are also copied.
Fields
The following fields are present on this tab :
| Select this check box to select this line. |
| This field displays the specific task operation code from the operational (task) structure of the source project that can be duplicated in the destination project. Each task code corresponds with an operational phase of a project. |
| This field displays the description of the task operation. |
| This field displays the top (or parent) level code in the operational (task) structure of the parent (or source) project. The parent level is used to group tasks together. |
| This field displays the task code from the operational (task) structure of the source project that will be duplicated in the destination project. Type in a different task code, if required. |
| This field displays the description from the operational (task) structure of the source project that will be duplicated in the destination project. Type in a different description, if required. |
| This field displays the site defined as the operating site (field Operating site) for the destination project but can be amended. |
| This field displays the chargeable budget code linked to this task. Budget codes enable consolidation of expenses coming from the tasks on the project budget (cost) structure. |
Presentation
This section is populated with the budget (cost) structure for the source project. The selection criteria you defined in the Criteria section determines which lines in the table are selected.
Use this table to individually select (or deselect) lines in the cost structure to copy to the destination project. You can adapt the source budget codes and descriptions for the destination project, and even change the site from the default values.
Budgets linked to tasks that you have selected to be copied to the destination project will be copied automatically. Parent tasks and budgets are also copied. Tasks linked to budgets that you select here are not copied automatically.
Close
Fields
The following fields are present on this tab :
| Select this check box to select this line. |
| This field displays the specific budget code from the budget (cost) structure of the source project that can be duplicated in the destination project. Each budget code represents a financial phase of a project. |
| This field displays the description of the budget code. |
| This field displays the top (or parent) level code in the budget (cost) structure of the parent (or source) project. The parent level is used to group and consolidate any sub-levels. |
| This field displays the budget code from the budget (cost) structure of the source project that will be duplicated in the destination project. Type in a different budget code, if required. |
| This field displays the description from the budget (cost) structure of the source project that will be duplicated in the destination project. Type in a different description, if required. |
| This field displays the financial site associated with the defined operating site (field Operating site) for the destination project but can be amended. |
Close
Presentation
This section displays additional options for controlling specific data that can be copied from the source project to the destination project.
Each check box is associated with a specific field in the source project. The suggested value (selected or clear) for each check box is predetermined for you. All 'descriptions', for example, are selected. You can clear or select each check box, as required.
The help for each field in this section prompts you to think about the effect of selecting the option (check box) on the destination project. For example, whether task dependencies should be copied from the source to the destination project.
You can also use this section to adapt the source task and budget codes for the destination project by applying a prefix and/or a suffix to the default codes.
The selected action on the associated field is only activated for each line selected in the Tasks or Budgets section.
Close
Fields
The following fields are present on this tab :
Tasks
| Use this field to define the task code prefix/suffix to apply to the selected destination task operation codes (task table field Destination code).
|
|   |
| Do you want the task predecessor (task dependencies) links to be cleared (each line in the Task planning > Predecessors section)? |
| Do you want the task operation predecessor (task operation dependencies) links to be cleared (each line in the Predecessors section in the Operation detail entry screen (available from the 'link' icon in the Assign column of a task operation))? |
| Do you want to duplicate the extended task descriptions (the value of the free-format Description (DESTEX) field available from the Edit icon at each level of the operational (task) structure)? |
| Do you want to duplicate the comments attached to the tasks (the value of the free-format Comment (COMTEX) field available from the Edit icon at each level of the operational (task) structure)? |
| Do you want to duplicate the extended labor task operation descriptions (the value of the free-format Description (DESTEX) field available from the Edit icon in the Desc column of each labor task line in the Operations section)? |
| Do you want to duplicate the comments attached to the labor task operations (the value of the free-format Comment (COMTEX) field available from the Edit icon in the Desc column of each labor task line in the Operations section)? |
| Do you want to duplicate the extended material requirement task descriptions (the value of the free-format Description (DESTEX) field available from the Edit icon in the Desc column of each material requirement task line in the Products section)? |
| Do you want to duplicate the comments attached to the material requirement tasks (the value of the free-format Comment (COMTEX) field available from the Edit icon in the Desc column of each material requirement task line in the Products section)? |
| Do you want to duplicate the extended descriptions for the individual employees assigned to labor task operations (the value of the free-format Description (DESTEX) field available from the Edit icon in the Desc column of each assigned employee)? |
| Do you want to duplicate the comments attached to the individual employees assigned to labor task operations (the value of the free-format Comment (COMTEX) field available from the Edit icon in the Desc column of each assigned employee)? |
Budgets
| Use this field to define the budget code prefix/suffix to apply to the selected destination budget codes (budget table field Destination code).
|
|   |
| Do you want to duplicate the extended budget code descriptions (the value of the free-format Description (DESTEX) field available from the Edit icon at each level of the Cost structure)? |
| Do you want to duplicate the comments attached to the budget codes (the value of the free-format Comment (COMTEX) field available from the Edit icon at each level of the Cost structure)? |
Budget lines
| Do you want to duplicate the extended budget line descriptions (the value of the free-format Description (DESTEX) field available from the Edit icon of each expense forecast line in the Budget lines section of the Cost structure)? |
| Do you want to duplicate the comments associated with each budget line (the value of the free-format Comment (COMTEX) field available from the Edit icon of each expense forecast line in the Budget lines section of the Cost structure)? |
Close
Click the OK action to copy all selected data from the defined source project to the destination project. The destination project code is generated automatically using the sequence code PJM if you have left the field New project (field DESTAFF) in the Home section blank. |
In addition to the generic error messages, the following messages can appear during the entry :
Do you want to create an analytical project dimension code for the new (destination) project? Select Yes or No.