Activity code > Module Common Data > Activity Code NMM (Number material lines) 

This activity code is used to determine the number of component lines on the cost calculation screen (standard costs, production costs, sub-contracting costs).

Recommended values

To determine the value, you must multiply the value of the MFM activity code (or the PSM activity code, if higher) by the maximum number of tracking that should be performed for each component.

For instance:

If max(MFM,PSM) = 50 and we consider that the maximum number of tracking per component will be 20, we must then enter the value 1000 (50*20)

Functions concerned

The following functions are impacted by the activity code  :

 Costing > Cost calculations > Standard cost calculation

 Costing > Production costs > Calculate expected cost

 Costing > Subcontract costs > Calc. expected subcon. cost

 Costing > Production costs > WIP finalization

 Costing > Subcontract costs > Calculate actual subcon. cost

Linked activity codes

The following technical activity codes are linked to the code NMM.These codes are never entered in folder management, because their value is calculated.

 NMMF (Number of lines groups), NMMO (Number OH lines Materials).