It is used to calculate the various costs corresponding to the various stages of the sub-contracting order in order to analyze the variances and the valuation choices in the production reporting.
These different costs are the following:
Expected theoretical cost: This corresponds to the standard cost but calculated for the expected production quantity. This cost is also included on the Production cost detail in the Planned column when the standard data is chosen as the Variance calculation source.
Provisional release cost: This is the provisional cost with respect to the sub-contracting order data. It is equivalent to what is included in the Production cost detail in the Planned column when the WO data is chosen as the Variance calculation source.
Provisional sub-contracting cost: This cost is similar to the provisional release cost but is calculated using the actual quantity produced.
The Provisional theoretical cost and the Provisional release cost are used to value the stock input of the sub-contracted product (according to the general setup CSTEORORD - EO receipt provisional cost). They are calculated either on demand or automatically during the creation and/or modification of the EO (according to the CLCWOCAUT - Auto provisional costs setup). The Provisional production cost can only be calculated for a closed EO.
A print-out can be requested at the end of the calculation (see report: Cost detail).
A certain number of inquiries are used to understand the production cost and provisional cost history for a product, to compare the production cost with respect to the other cost types for the site or another site (see theCost comparison, Production cost history, Production cost inquiry documentation).
Refer to documentation Implementation
This function is composed of a screen that is used to assign the selection criteria and the different calculation parameters.
Presentation
A site, a filter criteria (EO closed or not) and a sub-contracting order must be specified.
In the Order no. field, 3 options can be accessed by right click:
Print choice
This setup is used to indicate the print type required at the end of processing:
Close
Fields
The following fields are present on this tab :
Selection criteria
| Use this field to define the storage and/or production site. The site defined on the user record is displayed by default but can be amended.
|
| The calculation of the Production Cost Price can be carried out for orders: |
| EO or filter number. It is possible:
|
| This check box, that cannot be entered, is automatically activated when the selection comes from a filter. |
Calculations
| Enter the cost type to be calculated. |
| The printing of the cost price can be: |
| Use this field to define how overheads are valued. The default column is defined in the OVECOLxxx-xxx calc overhead column parameter (GPA chapter, COS group), where xxx corresponds to the type of cost calculation being performed (budget, standard, revised standard, simulation). You can change the default column, if required. The value of an overhead is calculated by applying the fixed rate or the formula in the chosen calculation column. |
| the update is only possible for cost prices of closed EO. |