Activity code > Module Common Data > Activity Code NMW (Number operation lines) 

This activity code is used to determine the number of work center lines on the cost calculation screen (standard costs, production costs, sub-contracting costs).

Recommended values

To determine the value, you must multiply the value of the MFO activity code by the maximum number of tracking that should be performed for each work center.

For instance:

If MFO = 20 and we consider that the maximum number of tracking per work center will be 20, we must then enter the value 400.

Without the Manufacturing module, the value that should be taken into account is the maximum number of receipts for a sub-contract order.

Functions concerned

The following functions are impacted by the activity code  :

 Costing > Cost calculations > Standard cost calculation

 Costing > Production costs > Calculate expected cost

 Costing > Subcontract costs > Calc. expected subcon. cost

 Costing > Production costs > WIP finalization

 Costing > Subcontract costs > Calculate actual subcon. cost

Linked activity codes

The following technical activity codes are linked to the code NMW.These codes are never entered in folder management, because their value is calculated.

 NMWO (Number OH lines Operations).