Use this template to import operation tracking data, with or without work orders, using the automatic processes developed for the production tracking plan. You can use it to import operation tracking data from any third party product into Sage X3 and to export from Sage X3.
Imported data uses the global variable GIMP to provide information not carried in the operation tracking (MKO) record as follows:
GIMP(1) – Tracking posting date
GIMP(2) – Operation time tracking declaration/plan Entry transaction to be used. If this field is not present or empty, the Entry transaction defined in the MKOTRSNUM - Import time tracking TRS parameter (GPA chapter, TRA group) is used.
GIMP(3) – Closed flag (1=No, 2=Yes). If not entered this will be calculated by the system.
GIMP(4) - Bill of materials
GIMP(5) - Alternative
The tracking type carried out as well as any linked processes such as material consumption will be defined by the Time tracking plan Entry transaction used.
The following parameters must be entered
MKOTRSNUM (defined at level Company) : Import time tracking TRS
The mandatory fields are as follows:
Table MFGOPETRK – Manufacturing tracking - operations
Tracking type=Work order tracking:
Tracking type=Routing tracking
Tracking type=Miscellaneous tracking
Table CPTANALIN – Analytical accounting lines (if tracking projects)
Additional fields such as the registration number will be mandatory if required by the Time tracking plan Entry transaction used.
The import of a BOM and a BOM alternative for the first two tracking types creates the production tracking and the associated material tracking. During Work order tracking the imported BOM is linked to one of the released products; the non-imported BOM is linked to the first released product.
In addition to the generic error messages, the following messages can appear during the entry :
Control message for the posting date (if not imported then the current date).
Registration ID control message.
Production site control message.
Work center control message.
Messages linked to the control of work order numbers:
Messages linked to the control of routing operation numbers:
This warning is displayed if the import file contains an additional operation for a work order that uses a routing that is version-managed.
This warning is displayed if the import file changes the work center for an existing operation for a work order that uses a routing that is version-managed.
All messages linked to the product (BOM) and routing controls are written to the System log.
This template can be used in import and export modes. The data is updated in the following tables :
Table | Table description |
---|---|
CPTANALIN [CAL] | Analytical accounting lines |
MFGHEADTRK [MTK] | |
MFGOPETRK [MKO] |