General parameters > Chapter Supervisor > Parameter CHGDAT (Date change allowed) 

This parameter allows the user if it is set to yes to change the current date via the "Date change" function. By default, this date is that of the connection date to X3. The connection date is usually the current date, but if the current date does not correspond to a date contained within the open periods, the nearest date meeting these constraints is used.

Level of localization / Global variable

The parameter is defined at the level User.Belongs to Module SUP (Supervisor) and to Group AUZ (Authorizations),in which the following parameters can also be found :

No global variable is associated to it.

Linked parameters

The following parameters are linked to the parameter CHGDAT  :

Supervisor

 ENDDAT (defined at level Folder) : End date

 STRDAT (defined at level Folder) : Start date

Functions concerned

The following functions are concerned by this parameter :

 Usage  > Users > Date change

The current date, defined by a system variable called datesyst, serves as a default value to a group of fields of the type date entered throughout the software.