Reports > Module Geode GX > Report RUPTUREBOM (Shortage status) 

This document is used to identify stock shortages linked to the launch of assembling waves.

This print corresponds to two reports: Shortage status by item and shortage status by DO

It can be printed automatically upon launching the wave if the stock configuration setup permits it. The two reports are set up in the stock configuration.

Prerequisite

Access to the report

This report can be accessed from the report menu of the group Outputs.

It is also called by default from the following functions :

 Stock > Assembly > Waves > Waves

List of criteria

Parameter

Parameter title

Type

site

Site

FCY

deposant

Depositor

DEP

vacation

Wave no

VAK

tri

Sort by product (Local menu No, Yes)

M1

impselections

Print selections (Local menu No, Yes)

M1

Description of the report

The header of the RUPTUREBOM report displays the following information:

  • Site and depositor
  • Assembling wave no.
  • AO no. on shortage: entered if the sort order is requested by AO.

For each line of the shortage report, the report mentions:

  • The item on shortage, along with the description
  • The AO no., the AO reference and the no. of the AO line concerned by the shortage
  • The total CUs on the line and the CU shortage quantity
  • The requested quantity of the AO line.
  • The information on the AO line: lot no., stock nature.
  • Number of CUs by kit and reason for the shortage.