Refer to documentation Implementation
The Upgrade function displays an initial screen into which you enter your selection (or filtering) criteria. Pending work orders (field Status='Pending') will be selected from the criteria you provide. You process the work orders from a second screen.
Presentation
Use the Selection criteria and Filters sections to define the production site and status of the work orders to be included.
A 'Planning' type formula is available to complete these selections.
Work orders with the status 'Being optimized' can be included if extended using an entry point.
A number of ranges are displayed.
You must then select the elements (BOMs, routing) of a work order to be updated.
Close
Fields
The following fields are present on this tab :
Selection criteria
| The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on their authorizations. |
| Enter, select or build an Enterprise Management filter calculation expression using the formula editor.
|
Filters
| Select this check box if planned work orders are to be processed. If planned work orders are to be excluded from the run, leave this check box clear. |
| Select this check box if firm work orders are to be processed. If firm work orders are to be excluded from the run, leave this check box clear. |
Start - end range
| This field displays the work order number (unique ID). |
|
| This field identifies the planned start date of the Work Order. |
|   |
| This field is used to filter the work orders assigned according to the released product. |
|   |
| Use this field to filter the work orders to those for a specific bill of materials (BOM) code. Multiple bills of materials (BOMs) can be defined for a single product. Each BOM code can be assigned specific management features. For manufactured or subcontracted products this includes restriction of the BOM to a specific site and to specific areas of functionality (for costing or for capacity planning). |
Several BOMs can be defined for a single product reference. The various BOM codes can be used to manage different product structures according to their use context such as:
This field can be left empty (value = 0) to enable manual entry of the components. In this case, only the component is loaded. |
| Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality (for use in a manufacturing environment, for costing or for capacity planning). |
  |
| This routing is used in work order management. |
|   |
Block number 4
| Use this field to indicate which elements of the selected work orders must be updated.
Routing BOM Routing and BOM
|
| Use this field to indicate how to proceed for work orders that contain unplanned elements. An 'element' might be an unexpected or unplanned component, unplanned operation or phantom subassembly, for example.
Ignore Keep unforeseen elements Discard unforeseen elements |
Close
Presentation
For the specified production site, the system selects all pending work orders (field Status='Pending') that meet the entered selection criteria. The planned production start date, routing information and the BOM code are included.
Close
Fields
The following fields are present on this tab :
Selection criteria
| The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on their authorizations. |
| Enter, select or build an Enterprise Management filter calculation expression using the formula editor.
|
Filters
| Select this check box if planned work orders are to be processed. If planned work orders are to be excluded from the run, leave this check box clear. |
| Select this check box if firm work orders are to be processed. If firm work orders are to be excluded from the run, leave this check box clear. |
Start - end range
| This field displays the work order number (unique ID). |
|
| This field identifies the planned start date of the Work Order. |
|   |
| This field is used to filter the work orders assigned according to the released product. |
|   |
| Use this field to filter the work orders to those for a specific bill of materials (BOM) code. Multiple bills of materials (BOMs) can be defined for a single product. Each BOM code can be assigned specific management features. For manufactured or subcontracted products this includes restriction of the BOM to a specific site and to specific areas of functionality (for costing or for capacity planning). |
Several BOMs can be defined for a single product reference. The various BOM codes can be used to manage different product structures according to their use context such as:
This field can be left empty (value = 0) to enable manual entry of the components. In this case, only the component is loaded. |
| Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality (for use in a manufacturing environment, for costing or for capacity planning). |
  |
| This routing is used in work order management. |
|   |
Block number 4
| Use this field to indicate which elements of the selected work orders must be updated.
Routing BOM Routing and BOM
|
| Use this field to indicate how to proceed for work orders that contain unplanned elements. An 'element' might be an unexpected or unplanned component, unplanned operation or phantom subassembly, for example.
Ignore Keep unforeseen elements Discard unforeseen elements |
Close
Action icon
Click Work orders from the Actions icon to view the work order details. The transaction you select determines the way in which you enter information, and what information is displayed and printed. If only one transaction has been set up you are not offered a choice, the default entry screen is displayed.
Close
This function can be run in batch mode. The standard task FUNMAUTM is provided for that purpose.
These actions are available when the list of work orders for the specified production site are displayed. This is after you have clicked the OK action on the initial selection screen.
Click Include all to select all displayed work orders. |
Click Exclude all to clear all selected work orders. |