Refer to documentation Implementation
The inquiry screen is used to display for each cost group the production cost price for this WO as well as the calculation parameters used .
Presentation
The header is used to enter the selection criteria.
Close
Fields
The following fields are present on this tab :
| Reference of the manufactured/sub-contracted product which cost price needs to be calculated. |
| Use this field to define the storage and/or production site. The site defined on the user record is displayed by default but can be amended.
|
|   |
|   |
| Work order/sub-contract order numbers used to select a cost price. |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
  |
|   |
  |
|   |
  |
Close
Presentation
This tab presents the different cost components of the subcontract order as well as the parameters used for its calculation.
Close
Fields
The following fields are present on this tab :
Block number 1
|   |
| This field contains the value linked to the material directly associated to the nomenclature first level of the product. |
|   |
|   |
| This field displays the subcontract service cost. The price used to value the service is specified by the VLTSCEOEXT - Service value price/planned PC parameter (ACH chapter, COS group). |
|   |
|   |
|   |
|   |
Grid Graph
|   |
|   |
Display graph
|   |
|   |
|   |
|   |
|   |
|   |
|   |
Close
Presentation
This graphical representation shows the production cost price breakdown by cost type.
Fields
The following fields are present on this tab :
Block number 1
|   |
|   |
|   |
|   |
|   |
|   |
|   |
|   |
Grid Graph
|   |
|   |
Display graph
|   |
|   |
|   |
|   |
|   |
|   |
|   |
Fields
The following fields are present on this tab :
Calculation setup
|   |
|   |
|   |
|   |
|   |
|   |
Close
This button is used to view the History of the production cost prices for the subcontracting of a product over a given period. |
In addition to the generic error messages, the following messages can appear during the entry :
This message appears after entering an EO number if there is no Production Cost Price record corresponding to the 4 identifying elements already entered.