Activity code > Module Manufacturing > Activity Code POPS (Production Scheduler) 

This activity code activates the Production Scheduler functionality. It is also used with the generic Finite scheduler interface.

  • If you are using the Production Scheduler functionality, select the Active check box.
  • To activate and use the Finite scheduler interface, leave the Active check box clear and activate the GFS - Finite scheduler activity code.
    GFS - Finite scheduler activity code

Production Scheduler is a planning tool used to view the scheduling of work orders in the form of a Gantt chart. It can optimize production cycles and control lead times. It provides flexible graphical production planning and scheduling capabilities.

Finite scheduler is a generic interface that provides an integration connector, developed by Sage, to connect to Sage X3 Web Scheduling or to any web scheduling solution developed by an ISV (independent software vendor) for either cloud or on-premises solutions.

A web scheduling solution (or Production Scheduler) is particularly useful for adjusting unexpected production or supply events.

Production Scheduler is only available for on-premises instances of Sage X3. The generic Finite scheduler interface can be activated for both cloud and on-premises solutions.

Production Scheduler is not available for new Sage X3 installations.

Functions impacted

The following functions are impacted by the activity code  :

 Manufacturing > Production Scheduler > Recalculate work order FDMA

 Manufacturing > Production Scheduler > Submit for scheduling

 Manufacturing > Production Scheduler > Production Scheduler

 Manufacturing > Production Scheduler > Production Scheduler viewer

 Manufacturing > Planning > Work order

 Manufacturing > Production Scheduler > Production Scheduler custom values

 Manufacturing > Production Scheduler > Remove from scheduling

Linked activity codes

The following technical activity codes are linked to the code POPS.These codes are never entered in folder management, because their value is calculated.

 POCOM (Planner One).

Comments

Production Scheduler only applies to on-premises instances of Sage X3; the generic Finite scheduler interface developed by Sage connects to cloud and on-premises solutions.