General parameters > Chapter Manufacturing > Parameter SCAMAJ (Material loss increase / costs) 

This parameter is used in the Provisional cost calculation function (standard, revised, budget and simulated).

  • If this setup is set to YES, the cost calculation takes into account the reject percentage carried by the BOM link in the component quantity calculation.
     
  • If not, only the net quantity is considered.

Level of localization/Global variable

This parameter is defined at the level Site.It belongs to Chapter GPA (Manufacturing) and the Group COS (Costs),The following parameters are also associated with this chapter and group :

The global variable GSCAMAJ is associated with it.

Functions concerned

The following functions are associated with this parameter :

 Stock > Inquiries > Stock > Trial kitting

 Costing > Cost calculations > Budgeted cost calculation

 Costing > Cost calculations > Revised cost calculation

 Costing > Cost calculations > Simulated cost calculation

 Costing > Cost calculations > Standard cost calculation