Quantities declared in production (Entry to stock of A)
Calculation of the effective time
Operation time OP10
Total effective time
3*105/100 = 3,15
3 : Number of hours for 100 parts
105 : Number of parts reported at operation level
100 : Number of planned parts
Operation time OP20
5*100/100 = 5,00
5 : Number of hours for 100 parts
100 : Number of parts reported at operation level
100 : Number of planned parts
Operation time OP30
10*90/100 = 9,00
10 : Number of hours for 100 parts
90 : Number of parts reported at operation level
100 : Number of planned parts
Total effective time=20.65
Calculation of the average quantity yield
Status A | Status Q | Status R |
85 | 2 | 3 |
Actual productive times: 25.40 h
Productive time for 100 parts, proportional time | OP10 | OP20 | OP30 |
Preparation time | 1 h | 0.50 h | 2 h |
Operating time | 3,15 | 5 | 9 |
Total productive times | 4,15 | 5,50 | 11 h |
Total effective time=20.65
Calculation of the average quantity yield
Calculation by operation | OP10 | OP20 | OP30 |
Quantity declared to be correct | 100 | 90 | 90 |
Actual quantity | 105 | 100 | 90 |
Yield by operation | 0.9523 | 0.90 | 1.00 |
Average quantity yield: (100+90+90)/(105+100+90)*100 = 94.91 %
Average time yield: (25,40/20,65)*100 = 123,00 %
Reported reject: 3/90 *100 = 3.33 %
Released quantity: 100 A products