Reports > Module Manufacturing > Report RENDOPE (Operating yield) 

This report describes the results of the production analyses for the product dimension view, and more particularly the operating yield.

(see the Production analyses and Product analysis printing documentations)

This report describes by site and by work order the quantity yield, the time yield, the theoretical reject (product-site record) and the actual reject.

An aggregation is achieved by product and production group.

The average quantity yield is the ratio between the quantity of achieved products and the quantity of rejected products reported at the level of each operation.

This indicator measures the loss by operation.

The average time yield is the ratio between the time achieved for each operation and the effective time.

The effective time is the theoretical time related to the quantity declared at the level of each operation.

Prerequisite

List of criteria

Parameter

Parameter title

Type

mfgfcydeb

Plant range

FCY

itmrefdeb

Product reference range

ITM

mfgnumdeb

Work order range

MFG

enddat

Analysis end date

D

impselections

Print selections (Local menu No, Yes)

M1

Description of the report

 Explanation of the formulas being used

Average quantity yield=(quantity declared to be correct at operation level/achieved quantity) *100

Average time yield=(achieved time/effective time) *100

Recorded reject=Reject/achieved

The reject is the quantity of parts declared with status R.

The achieved is the total declared quantity (A+Q+R).

Example of a calculation

Released product A , BOM of A: 2B + 1C + 25D

 

B

C

D

Link quantity

2 - proportional

1 - proportional

25 -fixed

Loss of this link

10%

5%

0

Attachment operation in the routing

OP10

OP20

None

Theoretical consumed quantity

Theoretical quantity

Consumed

B

(100*2*1.10)

C

(100*1*1.05)

D

 

220

105

25

Theoretical productive time

Productive time for 100 parts, proportional time

OP10

OP20

OP30

Preparation time

1 h

0.50 h

2 h

Operating time

3 h

5 h

10 h

  

 

WO tracking

OP10

OP20

OP30

Actual quantity

105

100

90

Rejected quantity

5

90

0

Setup time

1.50 h

0.65 h

1.45 h

Operating time

3.30 h

6 h

12.50 h

Actual consumption

B

C

D

Actual consumption of the components

223

103

26

 Quantities declared in production (Entry to stock of A)

 

Calculation of the effective time

Operation time OP10

Total effective time

3*105/100 = 3,15

3 : Number of hours for 100 parts

105 : Number of parts reported at operation level

100 : Number of planned parts

Operation time OP20

5*100/100 = 5,00

5 : Number of hours for 100 parts

100 : Number of parts reported at operation level

100 : Number of planned parts

Operation time OP30

10*90/100 = 9,00

10 : Number of hours for 100 parts

90 : Number of parts reported at operation level

100 : Number of planned parts

Total effective time=20.65

Calculation of the average quantity yield

 

Status A

Status Q

Status R

85

2

3

Actual productive times: 25.40 h

Productive time for 100 parts, proportional time

OP10

OP20

OP30

Preparation time

1 h

0.50 h

2 h

Operating time

3,15

5

9

Total productive times

4,15

5,50

11 h

Total effective time=20.65

Calculation of the average quantity yield

Calculation by operation

OP10

OP20

OP30

Quantity declared to be correct

100

90

90

Actual quantity

105

100

90

Yield by operation

0.9523

0.90

1.00

Average quantity yield: (100+90+90)/(105+100+90)*100 = 94.91 %

Average time yield: (25,40/20,65)*100 = 123,00 %

Reported reject: 3/90 *100 = 3.33 %

Released quantity: 100 A products